Hills Road cycle lanes: Frequently Asked Questions

Hills Road cycle lanesCambridgeshire County Council’s new cycle lanes on Hills Road have generated a record number of questions and concerns. Here are some of the most common ones:

Q: Why is Cambridgeshire County Council doing this?

A: The County wishes to enhance cycleways in order to meet the needs of the rapidly growing population, which will result in more traffic. The County would like to keep the extra motorised traffic to a minimum and encourage other modes of transport. Similar schemes have substantially increased cycling in other areas, particularly amongst children.

Q: How is it being funded?

A: Through central government’s Cycle City Ambition Fund.

Q: Who approved it?

A: County Council Highways officers identified Hills and Huntingdon Roads as main routes into Cambridge that would benefit from enhancement. The scheme was first presented to Cambridgeshire County Council’s Economy and Environment Committee in May 2014. Councillors deferred it as they were unhappy with elements of the scheme including the floating bus stops, and changes were made. It was passed in July 2014 at the second time of asking, with an undertaking to conduct traffic surveys before and after implementation, an amendment I requested, in order to assess the level of rat-running as a result of the narrower road carriageway. One survey was done last year and another will be done after completion.

Q: Will any trees be felled?
A: The County Council has stated categorically that no trees will be felled. Some pruning of vegetation that encroaches onto the public highway may be necessary.

Q: Will new rubbish bins be provided at bus stops?
A: Providing litter bins is a City Council responsibility. The County Project Team is discussing with City Council about replacement of old bins with new ones and other locations where a new bin may be desirable.

IMAG1839Q: How will works across junction mouths be organised?
A: Junctions are being closed off at weekends to allow works to be safely and quickly undertaken. Letterdrops to residents and advanced warning notices inform those affected at least one week in advance.

Q: How will work on junction mouths of cul de sacs be organised?
A: Junction works to be constructed one half at a time with access maintained into/out of the cul de sac.

Q: Could the concrete layby near Glebe Road be used as a bus stop?
A: This layby is halfway between two other bus stops so if a bus stop went there, the other two stops would be removed, meaning bus users would have a long walk to the next stop.

Q: What consultation took place before this scheme was agreed?
A: The proposals were advertised in FOCUS, as well as via a streetletter from myself to all residents in Hills Road and several of the side roads. The County Council delivered leaflets with feedback forms to a wide local area and held local staffed events in March 2014. Drawings and information on the proposed scheme were put on the County Council website, together with contact details.  The Team also had information stalls at Hills Road VI Form College, Long Road VI Form College and at an Addenbrooke’s Sustainability Event.

In November 2014 the County Cycling Team wrote again to residents inviting them to a pre-construction event at Rock Road Library — an opportunity to find out about boundary issues, construction sequence etc.  This event was well attended by residents of Hills Road. The letter included details of where the final drawings could be seen on the website and asked residents to provide email addresses if they wanted updates on the scheme.

Q: What will happen when there are weddings and funerals at the church? What about hearses and wedding cars?
A: The Cycling Team has been liaising with St John’s Church. During construction, the cycleway works will be left in an appropriate state to accommodate wedding cars and hearses. After completion, wedding cars and hearses will be able to park for the duration of services, as the new cycle lanes are not ‘mandatory’ and there are no loading restrictions attached to the double yellow lines.

Q: Is the width of the carriageway being reduced?
A: Yes, the carriageway width is being reduced, to 6m.

Q: Will there be a loss of grass verges?
A: The roadside verges next to the road will go, but there is a half metre sedum strip between the cycleway and the footway on both sides of the road.

On the outbound side of Hills Road, the verges next to the houses will be largely the same except where space is needed for the floating bus stops.   On the citybound side (the side with the current shared-use cycle/footway) the verges next to the houses are increasing.

Here is a link to the drawings showing details:
On the west side of Hills Road (S to N), from No. 284 to 256, and from 248 to 228, a 800 or 900mm wide strip of footway will be turned into new verge. From No. 226 to Homerton College this strip widens to between 1.4 and 1.6m and then it is about 2.5m wide running past Homerton College. On the east side (S to N),  there are no significant areas of new verge until you get to the block north of Glebe Road, No.s 253 to 247 have 1.2m wide new verges. Re. the loss of those verges on the residence side of the footway, the only real areas where there is loss of verge is near the floating bus stops (and to some extent near crossings) but this does vary depending on the location.

Q: Was Cambridge City Council consulted?
A: The City Council is a statutory consultee for every cycling project within Cambridge.   The Project Team was keen to gain the input of City’s Urban Design team on the Huntingdon Road and Hills Road schemes – a meeting with the City’s Head of Urban Design was arranged before the schemes were approved and, in neither case were concerns raised about the proposals.

Q: Are our streetlights being replaced to facilitate the cycleway scheme?
A: No, the streetlighting on Hills Road is not being replaced as a result of the cycleway scheme but as part of the County’s streetlighting replacement programme – as such, the lighting along the whole length of Hills Road is being updated to conform with new British standards.

Q: At present, the pavement cycleway on the northbound side of Hills Road provides a convenient way of turning into Luard Road. Won’t the new arrangement be more dangerous?
A: The main carriageway on Hills Road will be narrowed to 6m, which should reduce traffic speeds. Equally, the speeds of vehicles exiting side roads should be slowed by the tighter turning movements required by the new scheme.

The Road Safety Audit 2 did not raise any issues about the changes to this junction, nor the removal of the shared-use foot/cycleway. The new scheme (unlike the shared-use foot/cycleway) gives cyclists on Hills Road priority through the junction with Luard Road so there should be a reduction in the number of cycle-related accidents at this location. Less confident cyclists on Hills Road may choose to pull in and wait on the left side of the new southbound 2.3m cycle lane before turning right. The County Council will monitor the situation and may consider installing a central island that would offer cyclists some protection whilst waiting to turn right.

Q: How will it be made clear that vehicles cannot drive across or park on the cycleway?

A: Cycle symbols will be added to the cycle lane and double yellow lines will be painted on the main carriageway (next to the outside edge of the cycle lane) to prevent parking in the new lane. This work should be taking place on the northbound side in  November 2015.

Q: How will the construction for the southbound side of Hills Road be handled?

A: The intention is to keep the citybound shared-use path open whilst the outbound works are carried out – to ensure safety for cyclists and pedestrians during the construction phase. The footpath work will be done first, then the cycleway and ‘Cambridge kerb’.

Q: Whom do I contact for more information?
A: If it is an operational matter, contact Grant Weller at Cambridgeshire County Council: [email protected] If your question is about consultation or general principles, contact Mike Davies: [email protected]

MONDAY 5TH OCTOBER: REPORT ON THE PRESENTATION ON CYCLING SCHEMES AT SOUTH AREA MEETING, ST JOHN’S CHURCH, HILLS ROAD.

Hills Road cycle lanes layout: residents’ feedback prompts changes

hills roadIt is fair to say that views on the Hills Road cycle scheme are mixed, at least amongst local residents.

Council consultation results show Queen Edith’s residents split 50-50 between those who support the new segregated lanes and those who fear that the scheme will improve safety for cyclists at the expense of more vulnerable pedestrians.

Residents raised a number of concerns about safety, rat-running and access to properties. Councillors shared these concerns and asked County Council Highways officers to do further work to address safety issues. A number of changes have been made to the original proposals and the scheme will go back to councillors on 8th July.

Here is the report that they will receive. cycle lanes

  • There is now a clearer division between footway, bus stop and cycleway.
  • All the bus stop islands will be at least 2 metres wide and all waiting facilities will be on the island, so passengers won’t have to cross the cycleway as the bus arrives.
  • As the cycle lane approaches the bus stop it will veer left and narrow to 1.5 metres; there will then be a short ramp up to the level pedestrian crossing point, which will have tactile paving and be a different colour to the cycle lane. These differences are to alert cyclists of the need to be mindful of pedestrians.
  • The kerbs will now be sloped to allow cyclists to mount more easily should the need to leave the carriageway arise.
  • Although there will be double yellow lines, there will not be a loading ban to allow commercial vehicles to park briefly.
  • New gullies will be installed and a full CCTV drainage survey carried out to identify any necessary repairs.

There are concerns that if there are additional traffic hold-ups, motorists may evade them by using smaller streets off Hills Road – four of which have schools/ nursery schools. It is hard to predict the effect in advance, but I shall be asking for a traffic survey to be carried out before and after the scheme is input.